Stationary line with a capacity of up to 20 m3 of aerated concrete per day. The line includes a skip hoist, which is designed to weigh cement and sand, lift them to a height and load into a mixer. This greatly simplifies the work on the production line, taking into account the operation of the line in 2 shifts.
Number of personnel per shift | from 3 people |
Heating water | 50-60 C⁰ |
Power consumption | 5.5 kWh |
Indoor temperature | from 15 C⁰ |
Requirements for the premises | 9x20x4 m |