Stationary line with a capacity of up to 20 m3 of aerated concrete per day. Taking into account the work of the line in 2 shifts. It is also possible to supplement the line with a skip hoist, which is designed to weigh cement and sand, lift them to a height and load them into a mixer.
Number of personnel per shift | from 4 people |
Heating water | 50-60 C⁰ |
Power consumption | 4.5 kWh |
Indoor temperature | from 15 C⁰ |
Requirements for the premises | 9x20x2.5 m |